CaseHome > News

P265GH Boiler Tubes Production Process

The production of P265GH boiler tubes, compliant with EN 10216-2 standards, is a sophisticated process that ensures their suitability for high-temperature and high-pressure applications. Designed for industrial boilers and power generation systems, P265GH boiler tubes are crafted with precision to deliver a minimum yield strength of 265 MPa and exceptional durability.

The process begins with the selection of high-quality, low-carbon steel, alloyed with manganese and silicon to enhance strength and weldability. The raw materials are melted in advanced electric arc furnaces, producing uniform billets with minimal impurities. These billets undergo rigorous inspection to ensure compliance with strict standards. In the seamless production phase, billets are heated to high temperatures and pierced to form hollow tubes through hot rolling, a process that eliminates welds and ensures structural integrity.

The hollow tubes are then elongated and shaped in precision rolling mills to achieve exact dimensions and a smooth surface. Heat treatment follows, optimizing the microstructure for balanced strength and ductility, enabling the tubes to withstand temperatures up to 450°C. Advanced testing, including ultrasonic and hydrostatic methods, ensures defect-free tubes, while automated quality controls guarantee consistency. The final stage involves cutting and surface finishing to meet specific application requirements.

This meticulous production process results in P265GH boiler tubes that offer reliability and efficiency, making them indispensable for energy systems and industrial applications.